Digital Mining Workstation (Industrial Controller) - Protocol for Photovoltaic Power Generation - IEC60870- 5-104
As a professional provider of IoT data collection solutions, daq-iot, the data acquisition and IoT editor, will introduce the following content here and sincerely welcome everyone to discuss and communicate
Hardware parameters: cpu i5-6200u, 8G/DDR4, 256g/msata, 4USB3.0, 4USB2.0 5RS232, one way RS485.
Networking function: 2.4GHZ WiF, wired Ethernet.
System application: remote maintenance equipment, breakpoint transmission, serial port forwarding, protocol forwarding.
Voltage: Adapt to wide voltage 110~220V
KEPServerEX 6 (with hard dog)
Support IEC 60870-5-104 (IEC 104 for short) power automation communication protocol,
Support Modbus TCP/IP protocol data docking.
(1, the field collection of a photovoltaic power generation system needs to have IEC 60870 - 5- 104 protocol data collection;
2.Onesite collection of data from the ground mining power station system requires Modbus TCP protocol collection.
评论
发表评论