Multi functional integration of State Grid's network related renovation equipment Gateway

As a professional provider of IoT data acquisition solutions and an expert in industrial IoT data acquisition, the editor of Shanghai Data Acquisition IOT Technology Co., Ltd, (daq-iot) hereby presents the following introduction, and sincerely welcomes discussions and exchanges. Supported Communication Interfaces: CAN, RS485, Mbus, 4–20mA, Profibus, CC-Link, HART, digital I/O, etc. Industrial Protocols: Modbus RTU/TCP, HJ212, IEC104, DLT645, DLMS, IEC61850, MQTT, etc. Mail:export@daq-iot.com

1)Multi functional integration Gateway1 unit, including AGC, AVC module, network security monitoring moduleVertical encryption authentication module、 Data Acquisition module, wireless transmission module.

Power supply1 DC 24V power supply
network interface4-channel RJ45 interface
serial port8 serial ports: 2 × RS232/485 adaptive+6 × RS485
peripheral interface3 USB, 1 HDMI, 1 TYPE C
Installation requirementsSupport installation and fixation in standard cabinets
internal structureDesigned with no fan and no rotating components Hardware
storage4GB memory; 16GB storage space
Architectural DesignDesigned with non-x86 low-power industrial grade Hardware architecture
CPU type and quantityRK3568J quad core
safety moduleOPTEE Trusted Computing ArchitectureSSX1617-CThe power specific algorithm IS32U320A supports SM2/3
Memory type and capacityRS1G32LO4D2BDS-53BT DDR4 4G

2)Optical switchOne national network adapter must meet the pon networking requirements of Shanghai national network.

3)ONU One national network adapter must meet the pon networking requirements of Shanghai national network.

4)optical splitter One national network adapter must meet the pon networking requirements of Shanghai national network.

5)Primary frequency modulation device1 unit

serial numbernameparameter
1Power supplyquantityDual power supply with power loss alarm and switch
working voltageAC/DC 220V
power consumption< 50W
2Device ConfigurationCPU4-core ARM A55 4 × 1.8GHz
RAM4GB
storage16GB eMMC
Ethernet port4 channels: 4 x RJ45 10/100/1000Mbps adaptive (including 2 channels supporting Combo mode, SFP LC 100M/1000M adaptive)
serial port8 × RS232/485 adaptive, where serial port 8 can be switched to IRIG-B (RS485 differential mode)
discrete signal1 x 8 x DI+4 x DO expansion board, DI built-in 24VDC power supply, only allows access to passive nodes; DO default contact capacity 30VDC 5A, 250VAC 5A
consoleType-C(RS232)
display7-inch LCD touch screen, resolution 1024 × 600
USB port3×USB2.0
Exchange samplingOne AC sampling expansion board can meet the requirements of three-phase four wire or three-phase three wire wiring. AC rated voltage (effective value): 57.7V or 100V AC rated current (effective value): 1A or 5A
3Installation method and sizeInstallation Method4U 19 "rack mounted installation
Model size483 × 284 (including front handle, excluding handle 251) × 178mm
4working environmentOperating Temperature-25~+55℃
Operating Humidity5% to 95% non condensing
5Electromagnetic CompatibilityElectrostatic discharge immunityLevel 3, contact discharge ± 6KV, air discharge ± 8KV
Radio frequency electromagnetic field radiation immunityLevel 3, 10V/m, frequency range 80MHz-1000MHz
Electrical fast transient burst immunityLevel 3, power supply ± 2KV, repetition rates 5kHz and 100kHz
Surge (impact) immunityLevel 3, differential mode 1.0kV, common mode 2.0kV
Immunity to Conducted Disturbances Induced by Radio Frequency FieldsLevel 3, frequency range 150kHz-80MHz, detection voltage 10V
Power frequency magnetic field immunityLevel 5, 100A/m
Damping oscillation magnetic field immunityLevel 5, 100A/m, frequency 100kHz and 1MHz
Immunity to voltage dips, short interruptions, and voltage changesVoltage short-term interruption of 100%, duration of 50ms
Oscillatory wave immunity to interferenceLevel 3, common mode interference of 2.5 kV, differential mode interference of 1.25 kV, frequency of 100 kHz and 1 MHz
6Medium strengthPower port to ground1500V
Communication port to ground500V
Signal port to ground500V
Power port to communication port1500V
Communication port to signal port500V
Power port to signal port1500V
7impulse voltagePower port to ground5kV
Communication port to ground1kV
Signal port to ground1kV
8insulation resistancePower port to ground>5MΩ
Communication port to ground>5MΩ
Signal port to ground>5MΩ
Power port to communication port>5MΩ
Communication port to signal port>5MΩ
Power port to signal port>5MΩ
9Mechanical vibration and impact/Level I vibration durability and impact durability

3.6 Main job responsibilities

After including the debugging of the supplied equipment and the joint debugging with State Grid, and obtaining acceptance from State Grid, the project is considered completed.

2、 Professional qualification requirements and performance:

1. Professional qualification requirements:

(1) Must be a legal person or other organization registered within the territory of the People's Republic of China, providing a business license or registration certificate;

(2) Having a second level or higher qualification in electronic and intelligent engineering contracting;

(3) Having a comprehensive quality, environmental, and occupational health management assurance system, passing third-party certification audits, and obtaining certification certificates.

2. Performance requirements:

The quoting party has achieved at least 3 or more new energy PV categories in the past 3 years. The quoting party shall provide scanned copies of relevant contracts (including cover pages, main parameter pages, signature pages, etc.).

5. Requirements for personnel, equipment, and materials

5.1 Requirements for Construction Personnel

5.1.1 Network related renovation services require one project manager, who should be a formal employee of the quoting unit (subject to social security certification), with an age not exceeding the statutory retirement age,Having the core access permit certificate of State Grid Corporation of China and obtaining the access permit of the local power grid where the project is located (providing the access certificate)Have served as a project manager for at least one similar project within the past 5 years (provide proof of performance).

5.1.2 This project is equipped with at least one qualified debugging personnel, and all debugging personnel must holdState Grid Access CertificateAge not exceeding the statutory retirement age.

评论

此博客中的热门博文

Fanuc | Mazak | Siemens | Ludwei CNC Data Machine Tool Data Acquisition Software Monitoring Technology Solution

Factory production number, model, actual target output, electronic signboard, infrared Sensor acquisition display screen

DAQ-IOT Modbus RTU RS485 Split Core Current Transformer CT AC Analog Signal Coil Sensor DC 12V 5A DC Current Transformer Power On or Off Status Monitoring